A house with a rooftop solar array, seen from the air

13 miles from the workshop

Solar panels in Horsham

Washington sits inside the Horsham district, so this is not a town we travel to so much as the one we are already in — thirteen road miles up the A24, with Horsham stone roofs, four town-centre conservation areas and two network operators to get right.

What we find on Horsham roofs

If the roof is Horsham stone, the answer is almost never a standard hook. Survey first, and expect the design to change. On the modern estates north and east of the town the conversation is orientation and the battery wall, not the covering.

Distance, geography, housing stock and the planning position all change how a system gets designed. These are the ones that decide it in Horsham.

What we take into account here

  1. Approximately 13 road miles north of Washington on the A24 — the same district, the same council, the same roads.
  2. Washington is itself a village in the Horsham district of West Sussex, at the foot of the Downs beneath Chanctonbury Ring, with its own conservation area on the council’s list.
  3. Horsham stone — thick sandstone slabs laid in diminishing courses — roofs a good number of older properties across the district. It is heavy, brittle, irregular, and it changes the mounting conversation completely.
  4. Horsham District Council lists 39 conservation areas, four of them in Horsham town: the town centre, London Road, Richmond Road and Park Terrace Gardens. Roof-slope panels on a house stay permitted development inside them; what the national rules exclude is a panel on a wall or balcony fronting a highway, a flat-roof array without prior approval, and anything on a listed house.
  5. The district’s southern downland strip, including our Washington base, lies inside the South Downs National Park, where the same roof-slope rule applies and a flat-roof array needs prior approval first.
  6. Two network operators meet in the district: UK Power Networks for the RH12 and RH13 postcodes around the town, Scottish and Southern Electricity Networks for RH14 Billingshurst. The MPAN on your bill says which receives the G98 or G99 notification we make for every inverter.
  7. The council declared a climate and ecological emergency in 2023 and set net zero targets of 2030 for its own operations and 2050 for the district; its energy pages point residents to the West Sussex Affordable Energy service for grants and schemes.
  8. Substantial modern estate development north and east of the town centre — large, simple pitched roofs on concrete tile, where the only real question is which slope earns its keep.
  9. Full service coverage from Washington — solar, battery storage, EV charging, air conditioning and general electrical work by our own NICEIC-registered electricians.

Two kinds of Horsham roof, two kinds of job

In and around the four town-centre conservation areas the stock is older: Horsham stone, clay peg tile, slate, awkward access from the street and a planning position worth checking before anyone climbs a ladder. On the estates to the north and east it is modern concrete tile on simple pitches, which is the easiest roof in the county to put an array on. The survey tells us which job we are quoting, and the price follows the roof, not the postcode.

If the roof is Horsham stone the answer is almost never a standard hook. The fixing is chosen for the slab, the day runs longer, and sometimes the honest design keeps the array off the stone slope and uses an extension, an outbuilding or a flat roof instead. We would rather say so at the survey than discover it on the scaffold.

Permitted development in a Horsham conservation area

The rule most people arrive with is wrong. Under the national permitted-development class, a solar panel on the roof slope of a house in a conservation area, even a street-facing slope, does not need planning permission. The exclusions are a panel on a wall, balcony or roof enclosure fronting a highway, a flat-roof array on designated land, which has needed prior approval since December 2023, and any listed house, which sits outside the class entirely. An Article 4 direction can remove roof rights in a particular area, so we check the address against the council’s conservation area maps before the survey and put the answer in writing. Most of the time it is “nothing to apply for”.

What a Horsham quote from us contains

The scaffold, always. The network notification to UK Power Networks or SSEN, done by us. The electrical certificate for the new circuit, signed by the electricians who fitted it. The manufacturer registrations in your name. Bird mesh where the roof needs it, fitted while the scaffold is up. And the same honesty about Horsham stone that this page has. For the wider county picture, our solar panel installers in West Sussex page covers the three roof coverings and the two network operators; Billingshurst, nine miles west on the SSEN side, has a page of its own.

Batteries, and the Horsham stone question again

A battery on a Horsham job is usually the easier half. The stone roof decides where the panels can go; the battery goes on an internal wall that meets PAS 63100 — a garage, a utility, a boarded loft — and the inverter is notified to UK Power Networks for RH12 and RH13, or to SSEN out at Billingshurst, before it is switched on. On the estates north and east of the town centre the garage wall is usually free and the job is quick; in the conservation areas the honest answer is sometimes an outbuilding.

Which line goes on that wall is decided at the survey. A Sigenergy installer is proposing one assembly that inverts, stores and can charge the car, which suits a household already thinking about the drive; a Fox ESS battery and hybrid inverter are the two units in our own installation photograph. How we choose between the four lines is written out, without a number we cannot source. North of the district the county changes and the yield does too: solar panel cost in Surrey works the sum through for a Dorking roof with every assumption shown. For the electrical side on its own — a board change, an extra circuit, a fault — electricians in Horsham is the page. The estates with a car on the drive and the stone-roofed houses with a modest array are the two Horsham battery jobs — battery storage in Horsham covers both, and battery, EV and a Horsham estate house works one through.

Solar panel installers in Horsham: how a job runs

Two kinds of Horsham roof, two kinds of job. On the modern estates north and east of the centre the survey is thirty to forty-five minutes of orientation and board, the scaffold stands on the drive and the installation is typically one to two days. On a Horsham stone roof the answer is almost never a standard hook: the slabs are heavy, brittle and irregular, the mounting is a specialist job, and the array is often smaller than the house could use — which is the house where a battery earns most.

Inside the four town-centre conservation areas roof-slope panels on a house stay permitted development; a flat-roof array needs prior approval and a listed house sits outside the class. The certificate is signed by our own NICEIC-registered electricians, the registrations arrive in your name, and the inverter is notified to the right operator — RH12 and RH13 are UK Power Networks and RH14 Billingshurst is SSEN, and we read it from your MPAN because RH12 straddles the two.

Battery storage, EV charging and the electrics in Horsham

The estate house with a car on the drive is the Horsham battery case, worked through in battery storage in Horsham and battery, EV and a Horsham estate house; electricians in Horsham is the same team on the board. EV charger installation in Horsham is the charger side — a dedicated circuit, the right protection and the notification to the operator — and a car charged overnight is the largest single load most houses here will ever add, so it is sized in from the start.

Horsham District Council is one of the partners in West Sussex County Council’s on-street charging programme with Connected Kerb, which proposed phase-one sites in 78 locations across the county in August 2022, fully funded by the operator; a flat owner or renter with private off-street parking can claim 75% of a home charger up to £500 under the government’s grant.

What solar costs in Horsham, and what it pays

Most domestic installations typically start from around £4,000 to £6,000 depending on the size of the home and the amount of energy it uses; domestic solar and battery storage currently attract zero-rate VAT; the published average saving is £300–£600 per year, sometimes more with a battery or by working from home during the day. A Horsham stone roof can carry a higher mounting line than a tiled one, and we say so at the survey rather than on the scaffold.

PVGIS models a south-facing 4.5 kWp array at Washington, thirteen miles south in the same district, at about 1,125 kWh per kWp a year; an east–west estate roof runs at roughly 83% of a south one in our calculator. What you do not use goes out at the Smart Export Guarantee rate — 12p per kWh in our reference as at June 2026 — which is why the evening load and the car decide the battery. Sizing solar, a battery and a car as one system is the method; the calculator is the number.

Horsham in numbers

Thirteen road miles north on the A24, in our own district. Horsham District Council lists 39 conservation areas, four of them in the town. Horsham stone on a good number of the older roofs. Two network operators: UK Power Networks for RH12 and RH13, SSEN for RH14. Climate and ecological emergency declared 2023; net zero 2030 for the council’s own operations. The southern strip of the district, our Washington base included, inside the South Downs National Park. Neighbours: Billingshurst down the A272, Haywards Heath east.

Questions we get asked in Horsham

Do solar panels in Horsham need planning permission?

Usually not. On the roof slope of a house, including inside Horsham’s four town-centre conservation areas and the National Park strip, panels are permitted development. You need permission or prior approval for a panel on a wall or balcony fronting a highway, for a flat-roof array on designated land, and for anything on a listed house. We check the address against the council’s maps before the survey.

Can you put solar panels on a Horsham stone roof?

Sometimes, and sometimes the honest answer is to use another roof on the property. Horsham stone slabs are heavy, brittle and irregular, so a standard hook is almost never right; the fixing is chosen for the slab and the job takes longer. The survey decides it, and we tell you plainly if the stone slope is the wrong place for the array.

How much do solar panels cost in Horsham?

Most domestic installations typically start from around £4,000 to £6,000 depending on the size of your home and the amount of energy you use, with zero-rate VAT. A Horsham stone roof is a specialist mounting job and can carry a higher line than a concrete-tile estate roof; the survey gives you a written figure for yours.

Do you install EV chargers on the Horsham estates?

Yes — and we would rather design the charger, the battery and the array as one system, because the car is the load that changes the size of everything else. The charger is its own circuit and its own notification to UK Power Networks; the same electricians do the lot.

What we fit around here

The systems that suit Horsham

Three arrangements cover most of what goes on a West Sussex roof. Which one your house wants is decided at the survey, on the roof itself — not from a satellite image.

An all-black array on a tiled gable roof, seen from above
All-black array on a tiled roof
Ballasted mounting trays set out on a flat roof
Ballasted flat-roof system
A home battery, hybrid inverter and gateway installed on one wall
Battery & inverter, wall-mounted

Our own photographs. They show the systems we design and fit — not specific completed jobs in Horsham, and no customer or address is identified.

The same certifications, whichever end of the patch you are on.

MCS Certified
Microgeneration Certification Scheme
NICEIC Approved Contractor
Approved electrical contractor
RECC
Renewable Energy Consumer Code
Checkatrade
Vetted and monitored
TrustATrader
Trusted trader
SolaX Power
Approved installer

The next step

Book your free survey

Thirty to forty-five minutes, at your house, at no cost. We look at the roof, the fuse board and how you actually use the place — then send you a clear quote with the assumptions shown.

If solar genuinely won’t pay for itself on your usage, we’ll say so and save us both an afternoon.

Rather see the numbers before you speak to anybody? Put your own bill on the house — it works out the size, the saving and the payback while you watch, and brings them down to this form with you.

So we can tell you straight away if you're in our patch.

What are you thinking about?

  • MCS certified · NICEIC Approved Contractor
  • The survey takes 30–45 minutes
  • A clear, no-pressure quote afterwards

A free survey, no obligation, and nobody reading a script at you. Prefer to talk? 01243 882444.

Call WhatsApp Book Survey
Book a free survey or call 01243 882444